Mining Projects

Strategic Partnerships

The Group has already signed multiple JVs with the world's leading players in the Mining and Metals sectors and continues to attract foreign direct investments.

ABM Mining Moxico Resources

Khnaiguiyah Mine and Plant

ABM 50% · Moxico 50%
354 km² Licence Area
26 – 75 Mt Resource Growth
120 Mt Growth Target
17+ yrs Mine Life
~200,000 t Zn Conc. p.a. (55%)
~50,000 t Cu Conc. p.a. (24%)
Drilling at Khnaiguiyah project
Core logging at Khnaiguiyah project

The flagship Khnaiguiyah zinc, copper and manganese project is a vital contributor to Saudi Arabia’s Vision 2030. It is located 170 km SW of Riyadh.

Since grant of the licence in 2023, the JV has grown the resource from 26 m tonnes to 75 m tonnes, and targets further growth to 120 m tonnes.

The licenses cover a total area of 354 km². To date, within 9% of the licensed area has been explored in detail, and within which these JORC-compliant mineral reserves have been defined, highlighting substantial remaining exploration upside.

With a mine life exceeding 17 years, the project is expected to annually produce approximately 200,000 tonnes of zinc concentrate (55% grade), and 50,000 tonnes of copper concentrate (24% grade). A manganese concentrate will also be produced.

This project shares synergies with the groups’ smelter complex and will serve as a blueprint for scalable and integrated development, contributing to KSA’s mining and industrial objectives.

Greenfield Exploration sites

Owned 100%

The group is targeting four exploration sites with the objective of discovering and delineating gold and base metal resources with the potential for near-term production.

Umm Maru & Umm Surayha
176 km² · Au

Located SW of Riyadh within the Halaban complex, characterised by granite and schist rocks hosting quartz veins of orogenic gold mineralisation.

Surface sampling, geological mapping, trenching, ground magnetics, and IP surveys have been completed by ABM’s team supported by contractors. 16 exploration diamond core drillholes totaling 2,953m have been drilled and have resulted in assayed grades to 7.05g/t gold.

All work has been completed to JORC standards and a Competent Persons Report (CPR) completed. Work is now commencing on modelling mineralisation ahead of drilling to test for extensions and continuity.

Umm Shat Gharab
57 km² · Au

The Umm Shat Gharab project is located near the town of Ranyah, featuring diorite, metavolcanics, and metasediments with known historic and recently identified gold occurrences, adjacent to two separate north-south trending shear zones.

Surface sampling, geological mapping, trenching, ground magnetics, and IP surveys have been completed by ABM team and contractors. 11 exploration diamond core drillholes totaling 1,977m have been drilled and have resulted in grades to 7.80g/t gold.

All work has been completed to JORC standards and a CPR completed. Work is now commencing on modelling mineralisation ahead of drilling to test for extensions and continuity.

Afif
61 km² · Cu, Zn, Pb, Au

Close to the town of Afif. Historic drilling by the BRGM encountered mineralisation, which ABM have sought to verify and extend.

Surface sampling, geological mapping, trenching, ground magnetics, and a gravity survey have been completed by ABM’s team and contractors. 6 exploration diamond core drillholes totaling 1,806m have been drilled and have resulted in grades (in separate samples) to 1.89% copper, 6.86% lead, 4.66% zinc, and 6.85g/t gold.

All work has been completed to JORC standards and a CPR completed. An AI targeting study has also been carried out. Work is now commencing on modelling mineralisation ahead of drilling to test for extensions and continuity.

Exploration with Partners

ABM with partners successfully secured the following licences in 2024–2025.

ABM is in addition continuously evaluating and ranking new exploration licence opportunities. ABM has the objective of proving up to five new gold and/or base metal JORC compliant mineral resources by 2030 and a further five by 2035. As with the Khnaiguiyah deposit, ABM plans to develop these rapidly into mines, whilst continuing to follow high KSA and international standards.

Bir Umq

With Norin Mining
Target Mineral
Au
Location
Al Madinah
Area
187 km²

Five targets selected for focused drilling to verify continuity of gold mineralization. Safety & ESG initiatives launched, including a school renovation following a community needs assessment.

Hajjar South

With Norin Mining
Target Mineral
Zn, Au, Pb, Cu, Ag
Location
Al Baha
Area
989 km²

Brownfield licence targeting gold, copper, zinc and lead: 2m ounces of gold or 300,000t of copper. Mapping, geophysics and trenching are advanced, with a first phase of drilling commenced in 2026.

Jabal Said

With Zijin Mining
Target Mineral
Zn, Au, Cu
Location
Al Madinah
Area
1,061 km²

Targets discovery of 1m ounces of gold or 500,000t of copper. Surface mapping, an IP survey and a stream sediment survey are underway, with drilling planned for 2026.

ND26

With Gold & Minerals Company
Target Mineral
Au
Location
Taif
Area
75 km²

Advanced gold project targeting a new gold mine for KSA. Drilling, metallurgical testwork and engineering studies are being initiated to rapidly advance to a development decision.

Ad-Duwayhi West

With Shandong Gold
Target Mineral
Au
Location
Taif
Area
422 km²

Targeted for rapid delineation of a new and substantial gold resource, with exploration to start in 2026.

Future Licences

Pipeline

ABM has a strong track record of partnering for licence acquisition, both through auctions and by direct application.

Evaluating further opportunities and open to entering further bids on a sole or consortium basis.